Bedroom Lamp 2025 New Model Master Bedroom Ceiling Lamp Italian Style Light Luxury High-End Atmospheric Cloud-Like Eye-Protection Room Lamp
B$141.69
B$70.84
- Stock: In Stock
- Brand: Yinian Conceptual Art Home
- Model: t894056482943
- Weight: 0.50kg
0 views
















| Product Specifications | |
| Style | Simple and Modern |
| Control Type | App Control,Intelligent Voice Control,Smart Switch Control |
| Main Material of the Lamp Body | Aluminum |
| Origin | Mainland China |
| Model | Wt–0003 |
| Main Material of Lampshade | Acrylic |
| Voltage | 220 V |
| Ceiling Lamp Type | Wrought Iron Ceiling Lamp |
| Irradiation Area | 10㎡-18㎡,8m²–20m² |
| Is It Smartly Controlled? | Yes. |
| Light Source Type | Led Light |
| Color Classification | [Full Spectrum] Obsidian Black-30Cm-Three-Color Dimming,[Full Spectrum] Obsidian Black-30Cm-Tmall Smart,[Full Spectrum] Obsidian Black-30Cm-Xiaomi Smart,[Full Spectrum] Obsidian Black-40Cm-Three-Color Dimming,[Full Spectrum] Obsidian Black-40Cm-Tmall Smart,[Full Spectrum] Obsidian Black-40Cm-Xiaomi Smart,[Full Spectrum] Obsidian Black-50Cm-Three-Color Dimming,[Full Spectrum] Obsidian Black-50Cm-Tmall Smart,[Full Spectrum] Obsidian Black-50Cm-Xiaomi Smart,[Full Spectrum] Obsidian Black-60Cm-Three-Color Dimming,[Full Spectrum] Obsidian Black-60Cm-Tmall Smart,[Full Spectrum] Obsidian Black-60Cm-Xiaomi Smart |