Mingyixuan Original Ultra-Thin Seamless Ceiling Lamp Minimalist Children's Room Eye Protection Balcony Simple Study Bedroom Lamp
B$340.49
B$170.24
- Stock: In Stock
- Brand: Mingyixuan Home Flagship Store
- Model: t889349922809
- Weight: 0.50kg
0 views




























| Product Specifications | |
| Brand | MYX |
| Model | XD001-30 |
| Style | Minimalist |
| Main Material of Lamp Body | Aluminum |
| Lampshade Main Material | Acrylic |
| Applicable Area | 10-12㎡ |
| Voltage | 220-240v |
| Ceiling Light Type | Aluminum Ceiling Light |
| Whether to Control Intelligently | Yes |
| Waterproof Dustproof (Ip) | Ip40 |
| Irradiation Area | 5㎡-10㎡ |
| Color Temperature Range | 3000-6000K |
| Type of Light Source | Led Light |
| Color Classification | (Puri) 30cm - Milk White - Aluminum Frame Ultra-Thin Side Light - Suitable for 5-8㎡-Tmall Elf/Wuji,(Puri) 40cm - Milk White - Aluminum Frame Ultra-Thin Side Light - Suitable for 8-10㎡-Tmall Elf/Wuji,(Puri) 50cm - Milk White - Aluminum Frame Ultra-Thin Side Light - Suitable for 10-12㎡-Tmall Elf/Wuji,(Puri) 60Cm-Milk White-Aluminum Frame Ultra-Thin Side Light-Suitable for 12-15 ㎡ -Tmall Elf/Wuji,(Puri) 30Cm-White-Aluminum Frame Ultra-Thin Side Light-Suitable for 5-8㎡-Tmall Elf/Wuji,(Puri) 40Cm-White-Aluminum Frame Ultra-Thin Side Light-Suitable for 8-10㎡-Tmall Elf/Wuji,(Puri) 50Cm-White-Aluminum Frame Ultra-Thin Side Light-Suitable for 10-12㎡-Tmall Elf/Wuji,(Puri) 60Cm-White-Aluminum Frame Ultra-Thin Side Light-Suitable for 12-15㎡-Tmall Elf/Wuji,(Puri) 30Cm-White-Aluminum Frame Ultra-Thin Side Light-Suitable for 5-8㎡-Already Connected to Mijia App/Wiji,(Puri) 40Cm-White-Aluminum Frame Ultra-Thin Side Light-Suitable for 8-10㎡-Already Connected to Mijia App/Wiji,(Puri) 50Cm-White-Aluminum Frame Ultra-Thin Side Light-Suitable for 10-12㎡-Already Connected to Mijia App/Wiji,(Puri) 60Cm-White-Aluminum Frame Ultra-Thin Side Light-Suitable for 12-15㎡-Already Connected to Mijia App/Wiji |